|
Double walled construction with inner and outer chamber made
of S.S. the gap in between being filled with glass wool. The
condenser and top are also made of S.S. The raw water is first
made of pass around tubes in the condenser where it gets heated
nearly to the boiling point thus economizing the heating energy.
The heated water passes to the evaporator through a water
level maintaining pipe. Excess water is let out through the
drain. To work on 220/230 volts A.C. supply.
|